A Groundwork company - serving Antioch, CA
Full Bathroom Remodeling in Alamo, CA | Groundwork Construction Co. of Antioch

Full Bathroom Remodeling in Alamo - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Alamo, CA: What It Costs and How Long It Takes

Full bathroom remodeling in Alamo typically runs $9,000 – $28,000 and takes four to seven weeks of active construction once materials are on site. That covers a complete gut: demo down to studs, new plumbing rough-in and electrical, waterproofing, tile, fixtures, vanity, and paint. Most Alamo homes are on county permits and half-acre-plus lots, so plan an extra week or two on the front end for plan review. Call (888) 419-3650 and we’ll walk your bathroom and give you a written line-item range before anyone swings a hammer.

Contractors installing wooden wall framing for a bathroom remodeling project in Alamo, CA

Call (888) 419-3650

How a Full Bathroom Remodel Actually Unfolds, Stage by Stage

You’ll hear contractors say “we handle everything.” Here’s what that actually means on a full bathroom remodel, in order, with real durations.

Stage 1 – Demo and rough inspection (days 1 – 2). We protect the floors and hallway with hardboard, shut off water at the fixture stops, pull the toilet, and strip the bathroom to studs and subfloor. Old tile comes off with a rotary hammer; the shop vac runs constantly. By end of day 2 the room is open and we can see what’s behind the walls. That’s when we know whether the framing is sound or whether you’re looking at rot from a slow leak.

Stage 2 – Rough-in plumbing and electrical (days 3 – 5). This is the decision-heavy week. You confirm fixture locations before we solder anything. If you’re keeping the tub and toilet where they are, rough-in is fast. If you’re moving the shower valve to the opposite wall or adding a heated towel circuit, we’re cutting framing and running new lines, and the county inspector needs to see the rough plumbing and electrical before it gets covered. In Alamo, that inspection is scheduled through Contra Costa County, not a city building department, and the turnaround is usually a few business days.

Stage 3 – Waterproofing and substrate (days 5 – 8). Cement board or a foam shower system goes up, seams get taped and thinset, and the whole wet area gets a liquid or sheet membrane. This is the stage nobody sees and the one that determines whether your shower fails in eight years. We flood-test the pan before any tile touches it.

Stage 4 – Tile, glass, and trim (days 8 – 18). Floor tile, shower walls, niche, and curb go in. Grout and sealer follow. Your glass shower enclosure gets templated after tile is set, so there’s a lead time gap here of roughly a week to ten days for fabrication. Meanwhile we set the vanity, top, mirrors, and lighting.

Stage 5 – Fixtures, paint, punch (days 18 – 25). Toilet, faucets, shower trim, towel bars, and paint. Then a full walkthrough with you, a punch list, and a re-clean. The 730-Day Done Right Promise covers the workmanship from that point forward, and if something’s not right, we come back and make it right.

Total labor time on a standard Alamo hall bath lands around four to six weeks. A larger primary bath with a freestanding tub, dual vanity, and a curbless shower pushes toward seven. Material lead times are the wild card, not the work itself.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make Between

A full bathroom remodel is a stack of decisions, and most of them fall into two buckets: things that last and things that look good. Here’s the honest breakdown.

  • Tile size and material: Large-format porcelain (12×24 or bigger) means fewer grout lines and easier cleaning, but it demands a dead-flat substrate and costs more in labor to set correctly. Smaller hex or penny tile looks great on the floor and costs less per square foot but takes longer to install, so the labor savings disappear. Natural stone (marble, travertine) is premium and needs sealing every year or two, especially with Alamo’s hard water.
  • Shower system: A traditional tile-and-membrane pan is the workhorse. A foam board system with a pre-sloped pan is faster to install and easier to waterproof reliably. A curbless, linear-drain shower is the current favorite for aging-in-place and looks, and it adds complexity and cost to the framing and waterproofing.
  • Vanity and countertop: Stock cabinetry in a standard size runs $800 – $3,000 installed and gets you a decent plywood box with soft-close doors. Semi-custom gets you the exact width your wall needs. Countertop choices matter here: quartz holds up to water and cleaning products without sealing, granite needs resealing, and marble shows every water spot.
  • Fixtures and finish: A $150 shower trim and a $900 thermostatic system both spray water. The difference is temperature control, finish durability, and how long the cartridge lasts. Kohler and similar brands sit in the middle of that range and hold up well. Cheap import trim is where we see premature failures.
  • Ventilation: A properly sized exhaust fan ducted to the exterior, not into the attic, is non-negotiable in a bathroom. Alamo’s hot, dry summers mean moisture leaves fast, but winter humidity and a poorly vented fan will grow mold on the ceiling within a couple of seasons.

If this full bathroom remodel is part of a larger Bathroom Remodeling in Alamo project that touches the adjacent bedroom or hall, we sequence the trades so you’re not living in a construction zone longer than necessary.

Two construction workers framing a wall for a bathroom remodel. in Alamo, CA

What Full Bathroom Remodeling Costs in Alamo, CA

Expect $9,000 – $28,000 for a full bathroom remodel in Alamo. That range is wide on purpose, because the same 60-square-foot room can land at either end depending on a handful of factors.

  • Size and layout: A hall bath under 50 square feet sits at the low end. A primary bath over 100 square feet with dual vanities and a separate tub and shower climbs toward the top.
  • Relocating plumbing or electrical: Moving a drain is the single biggest cost jump. Keeping the toilet and shower drain where they are saves roughly $1,500 – $3,000 in rough-in and concrete or subfloor work.
  • Existing condition: Rot, mold, or a failing subfloor found at demo adds cost you can’t see until the walls are open. In older Alamo homes we plan for some.
  • Material grade: Standard porcelain and stock vanity vs. large-format tile and custom cabinetry is the difference between $9,000 and $28,000 on its own.
  • Permit scope: A cosmetic refresh may not need a permit. Moving plumbing, electrical, or walls does, and the county review adds cost and time.

A written estimate from us breaks out demo, rough-in, tile labor, materials, fixtures, and permit fees line by line. What isn’t included is anything you decide to add mid-job. Our upfront pricing means the number you see is the number you pay, and change orders only happen if you ask for a change. The Bathroom Remodeling service overview covers how we scope larger multi-room projects that touch more than one bath.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Alamo Homes Specifically Do to This Job

Alamo is unincorporated, so every full bathroom remodel here runs through Contra Costa County building and fire review rather than a city hall, and the county is thorough on plan review. On the multi-acre estate lots that define the valley, that matters in ways that don’t show up in neighboring Walnut Creek or Danville. Older Alamo homes built from the 1950s through the 2000s often have undersized or cast-iron drain lines and galvanized supply lines that look fine until the walls are open, so we plan for a possible re-pipe during rough-in rather than discovering it mid-tile. The San Ramon Valley’s hard water is another local factor: showerheads and cartridges scale up faster here than on the Peninsula, so we lean toward fixtures with replaceable cartridges and finish warranties. Homes off Stone Valley Road and similar hillside lots can carry their own quirks, from well-supplied water with different mineral content to pressure regulators that fail and stress older supply lines. And on properties with private septic, we always confirm before demo whether the bathroom shares a line with other fixtures. We cover Alamo regularly, and if you’re also dealing with storm wear on the exterior while the bathroom is torn up, homeowners often pair this with Roof Repair in Alamo before the next wet season arrives.

Serving Alamo, CA – Our Local Coverage Area

We serve Alamo and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Bathroom Remodeling in Alamo

Get a Free Estimate for Your Full Bathroom Remodeling

Call (888) 419-3650 to schedule a free on-site estimate for full bathroom remodeling in Alamo. We’ll walk the bathroom with you, measure, ask what you want to keep and what you want gone, and follow up with a written line-item range and a realistic schedule. Live person on the phone, no voicemail, no pressure. If the number works, we talk next steps; if it doesn’t, you’ve lost nothing.

Written by the team at Groundwork Construction Co.

Why Alamo Chooses Groundwork Construction Co. of Antioch

We set the standard for full bathroom remodeling in Alamo.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Alamo

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Alamo Customers Say

Trusted by homeowners across Alamo and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Bathroom Remodeling in Alamo?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Alamo.

(888) 419-3650

Request a Free Estimate in Alamo

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch