Concrete Driveways & Concrete Work in Pleasant Hill, CA: What to Expect
Concrete Driveways & Concrete Work in Pleasant Hill, CA typically runs $4,500 – $12,000 for a full pour and takes 3 – 5 working days from demo to the day you can drive on it. A standard two-car apron is two days of forming and pouring, then a week of curing before it takes real weight. Call (888) 419-3650 and we’ll walk your driveway and give you a written, line-item number before anything gets torn out.

How a Concrete Driveway Gets Built Here, Start to Finish
Concrete is unforgiving. The pour is the easy part; almost everything that decides whether your driveway still looks right in fifteen years happens before a single yard of mud shows up. Here’s the sequence we run, with the time each stage takes.
Stage 1: Layout, demo, and the truck you didn’t plan for (day 1)
We mark the new edges, confirm the slope away from the garage, and saw-cut and break out the old slab. That’s a full day for a typical 400 – 600 sq ft driveway. You decide at this point whether we’re keeping the same footprint or widening it, because moving the apron changes the demo and the permit. If there’s a buried irrigation line or an old oil line in the way, this is when we find it.
Stage 2: Excavation and base prep (day 2)
Concrete cracks because the ground under it moves, not because the concrete is bad. We excavate to depth, haul off the spoils, and compact a crushed base in lifts. On the hillside lots that back toward the ridges, this is where drainage decisions get made. You decide now whether you want a channel drain at the garage or just a steeper fall away from the house.
Stage 3: Forms, rebar, and inspection (day 3)
We set the forms, tie the rebar grid, and set any conduit for lighting or a future gate. If your project needs a grading or encroachment sign-off, this is the stage where the inspector comes out, and we build the schedule around that. You decide the finish here: broom, exposed aggregate, or a salt-and-pepper look. Once mud is in the forms, that decision is locked.
Stage 4: The pour (day 4)
Typically a morning pour with a second truck if the driveway is large. We screed, float, edge, and finish, then cut control joints at the right spacing. Control joints are the difference between a hairline crack you ignore and a fault line you stare at for a decade.
Stage 5: Cure and the gate (days 5 and beyond)
You can usually walk on it after 24 – 48 hours. Keep vehicles off it for about 7 days and heavy trucks off for 28. That last one matters: a moving truck on day 4 will leave tire marks you can’t fix. We leave you a written cure timeline so nobody in the household guesses.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
- Standard gray broom finish: The workhorse. Best grip in the rain, hides tire dust, lowest cost. Suits most Pleasant Hill ranch driveways.
- Exposed aggregate: Pebble surface, more texture, more visual interest. Costs more per square foot and holds dirt in the crevices, but it’s durable and reads warmer than plain gray.
- Stamped or decorative concrete: If you want the look of pavers or stone without the joints, this is the route. Higher price, and the finish is only as good as the crew doing it.
- Light or heavy reinforcement: A rebar grid is standard for driveways; fiber mesh alone is cheaper but not what we’d put under a truck-sized load.
- Thickness: 4 inches for a standard passenger driveway, 5 – 6 inches where an RV or heavy truck parks. This is a real cost lever and a real durability lever.
- Drainage: A channel drain, a trench drain, or a designed slope. Cheap to add during the pour, expensive to retrofit later.
If the project is part of a larger plan, homeowners often pair this with our Driveway & Pavers in Pleasant Hill work for the surrounding hardscape, or with a Garage Conversion ADU in Pleasant Hill when the driveway footprint and the garage are being rethought together.
What Concrete Driveways & Concrete Work Costs in Pleasant Hill, CA
Plan on $4,500 – $12,000 for a concrete driveway installation, with replacement of an existing driveway landing in the $5,000 – $14,000 range. Those numbers assume a standard footprint with normal access. Here’s what pushes a job to the low or high end:

- Square footage and thickness: A single-car apron sits near the bottom; a long double-wide pad with a thickened RV section climbs toward the top.
- Demo and haul-off: Breaking out an old slab and trucking it away adds real cost. A clean lot with no demo stays low.
- Access: If a truck can’t back to the pour, you’re paying for pump or wheelbarrow time. Narrow lots and steep hillside drives cost more.
- Site conditions: Hillside lots near the open-space ridges often need grading, drainage, or a retaining element, and those move the number fast.
- Finish and extras: Decorative finishes, integrated lighting conduit, and drainage hardware are line items, not surprises.
Every written estimate from us breaks out demo, base prep, reinforcement, thickness, finish, and disposal as separate lines. The number you see is the number you pay. What isn’t included: anything we couldn’t see on the walkthrough, like a failed sub-base under an old slab or a buried utility that has to be rerouted. Those get a change order in writing before we touch them, never a surprise on the final invoice.
See the difference
Before
After
Before
After
Before
AfterWhat Pleasant Hill Homes Specifically Do to This Job
Pleasant Hill is a built-out, post-WWII Contra Costa suburb. Almost nothing here is new ground-up construction; the work is remodel, rebuild, and replacement on mid-century stock. That changes a concrete job in ways it wouldn’t in a newer town. The dominant housing is 1950s – 1970s single-story ranch and Eichler-adjacent tract homes, and many sit on shallow or slab-on-grade foundations, which means the driveway apron and the drainage grade tie directly into how the house was built. The city also runs a strict, small-city permitting culture, so a driveway replacement that alters the apron, the slope, or the street connection typically needs a permit and an inspection rather than a handshake.
Then there’s the ground itself. Properties backing the oak-covered ridges sit on the Concord fault and often on sloped lots, so drainage and grading get real scrutiny here in a way flat-land neighbors in Concord don’t face. Our hot, dry summers and winter rain load work the slab hard: expansion and contraction opens hairline cracks in a poorly reinforced pour, and water that pools at the garage threshold finds its way inside. If any of that sounds like your driveway, the fix is in the base and the drainage, not a new coat of paint. For the broader project around the slab, see our Driveway & Pavers service and our Pleasant Hill page for what else we handle around 94523.
Serving Pleasant Hill, CA – Our Local Coverage Area
We serve Pleasant Hill and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Concrete Driveways & Concrete Work in Pleasant Hill
Most driveways run 3 – 5 working days from demo to finish, plus about 7 days before you park on it and up to 28 before heavy trucks. The wildcard is inspection scheduling if the apron or grading triggers review. Call (888) 419-3650 and we’ll give you a realistic date range after we see the site.
Often yes, especially when the driveway apron, slope, or street connection changes. We pull the permits and pass the inspections as part of the job, and we’ll tell you up front whether yours needs one. Call (888) 419-3650 and we’ll look at the specifics of your lot.
In most cases yes, because the driveway sits outside the footprint of the house. The exceptions are buried utility lines, a failed sub-base under an old slab, or a garage threshold that needs to be re-graded. We flag those before demo, not after.
Installing a new concrete driveway runs $4,500 – $12,000; replacing an existing one runs about $5,000 – $14,000. Square footage, demo, site access, drainage, and finish are what move the number. Call (888) 419-3650 for a free on-site estimate with a line-item quote.
Every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space, and it’s in writing. Call (888) 419-3650 for the details on your specific job.
Get a Free On-Site Estimate for Concrete Work in Pleasant Hill
We’ll walk your driveway, check the base and drainage, and hand you a written, line-item estimate with no pressure and no surprises. Calls are answered by a live person, 24/7, so you’re never stuck leaving a voicemail. Financing runs at 0% for 18 months, and projects over $10,000 take $1,000 off. If a garage rework is on your list too, a New Detached ADU in Pleasant Hill is something we often pour the drive for in the same plan. Call (888) 419-3650 to schedule your free estimate.
Written by the team at Groundwork Construction Co. of Antioch.