Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Antioch Owner’s Guide
We build and finish home additions and ADU projects in Antioch that are designed around CGI-compatible systems and materials, and installed projects here typically run $45,000 – $130,000 for an addition and $90,000 – $220,000 for a detached or attached ADU. Plans are quoted upfront with no change-order surprises, and every job is backed by our 730-Day Done Right Promise. Additions aren’t same-day work – a real ADU or addition takes months of permitting and construction, and anyone telling you otherwise is selling you something that won’t pass inspection.
Owners usually find out something is wrong in stages. First the drawer slides in a new vanity start dragging, or the finish on a CGI-spec cabinet run near a patio door swells and cups after a wet winter. Then come the harder calls: a subpanel that trips when the ADU kitchen appliances kick on, a sliding door that won’t latch square, or a floor that feels soft near the new foundation transition. Each of those traces back to a compatibility decision made early – which is why we walk the spec before a single nail goes in.
Key takeaways
- Antioch additions: $45,000 – $130,000. ADU construction: $90,000 – $220,000. Garage conversions: $30,000 – $80,000.
- Compatibility problems show up months after handoff, not at final walkthrough.
- We’re an independent builder, not affiliated with CGI – we work with CGI-compatible components and spec them honestly.
- Upfront pricing, free design consult, and a written workmanship guarantee on every project.
Which CGI Models This Applies To
CGI’s residential line covers a wide spread – from smaller attached addition packages to full ADU shells – and the compatibility rules change depending on which series you’re working from. Before we order a single component, we identify the exact model and series from the data plate, usually inside a cabinet, on the threshold of a unit door, or stamped on the frame of the structural package. If the plate is missing, we measure the rough opening, the wall height, and the floor-to-header span; those three numbers usually pin the series down.
The compatibility gotcha that bites Antioch owners most often: CGI’s exterior-rated components and their interior-rated equivalents share dimensions but not weather performance. A part that specs fine for an interior hall closet will fail within two summers on an east-facing Antioch wall, where afternoon sun and dry-season heat push surface temps well past what the interior spec tolerates. Same footprint, wrong rating.
On the OEM-vs-aftermarket call, we don’t have a blanket answer. For structural and envelope components, we stick with OEM or an OEM-equivalent from a verified supplier – the tolerances are too tight to gamble on. For hardware, trim, and finish items, a quality aftermarket equivalent often outlasts the original at a lower cost, and we’ll say so plainly when that’s the case. We don’t stock parts and we don’t carry inventory on a truck; we source to your model and your spec.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
Here’s what we actually see on Antioch jobs, and what’s usually behind it:
- Sticking doors and windows that won’t latch square. This is almost always a foundation or framing settlement issue, not a hardware problem. In Antioch’s expansive clay soils, movement through a wet winter and dry summer shows up at the openings first.
- Soft or springy floors near the transition to the original house. Usually a subfloor or joist connection that wasn’t spec’d for the load. Left alone, it spreads – and it’s a much bigger repair at year three than at month three.
- Recurring moisture or efflorescence on interior walls of the addition. A flashing or weather-barrier detail failed at the roof-to-wall intersection. This is the number one cause of premature failure we correct on CGI-spec additions in the Antioch hills, where wind-driven rain hits harder than the flatland specs account for.
- Subpanel breakers tripping when the ADU kitchen or HVAC kicks on. The electrical load calculation didn’t account for the actual appliance package. Fixable, but it needs a licensed electrician – not a bigger breaker.
- Finish cupping, swelling, or delaminating on cabinetry and trim. Interior-rated material used in a semi-conditioned or exterior-adjacent space. Common in garage conversions where the original door and ventilation weren’t upgraded.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Full replacement or rebuild pricing in Antioch depends on scope, permits, and whether we’re correcting a failed component or rebuilding a section around it. Here’s how the ranges break down:
| Project | Installed Range (Antioch) |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What drives the number up: foundation work, structural corrections, electrical panel upgrades, and permitting complexity. What keeps it down: reusing sound existing structure and finish. Every quote is line-item, itemized by trade, with the number you see being the number you pay. Parts and labor are broken out, and the 730-Day Done Right Promise covers the workmanship – if it’s not done right, we make it right. Free design consult included on every project.
DIY or Call Us?
Some things you can safely check yourself. Walk the perimeter of your addition and look for cracks wider than a credit card, gaps at the roofline, or staining on interior walls. Test doors and windows for square. Note which breakers trip and when. That information helps us quote accurately and saves you time on the diagnostic.
What you shouldn’t do: open a subpanel, pull a permit yourself on a structural correction, or try to reseal flashing on a roof-to-wall junction without fall protection. Electrical work in an ADU subpanel is genuinely dangerous – 240-volt circuits don’t give second chances – and a bad flashing repair costs more to fix at year two than it would have to do right the first time. For structural, electrical, and envelope work, call a licensed professional. For everything else, call us at (888) 419-3650 and we’ll tell you honestly what you’re looking at.
FAQs
A properly built and detailed addition should hold up 30+ years before any structural repair, but the envelope details – flashing, weather barrier, roof-to-wall junctions – are what determine whether you get 30 years or 12. In Antioch’s climate, the wet-winter/dry-summer swing is hard on anything that wasn’t detailed for it. If you’re seeing symptoms early, call (888) 419-3650 – a diagnostic visit is free.
Often yes. Settlement at a door or window is frequently repairable with underpinning and reframing rather than a full rebuild. Flashing failures are usually a targeted repair. What can’t be repaired is a load calculation that was wrong from day one – that needs a correction, not a patch. We’ll tell you which category you’re in after the assessment, and the estimate is free.
A targeted repair like a flashing correction or a door realignment is usually completed in a single visit. A structural correction or partial rebuild runs one to three weeks depending on permitting. A full addition is four to eight months, and an ADU is six to twelve months once permits clear. We schedule around your household and keep you updated at every phase.
We source directly from CGI and from verified suppliers who carry the exact series and rating your model requires, matched to the data plate. We don’t stock parts and we don’t guess at compatibility – every component is confirmed against your model before it’s ordered. Our technicians bring up to 12 years of experience to every job, and calls are answered live, 24/7.
Whether you’re pricing a CGI-spec addition, an ADU build, or a garage conversion in Antioch, we’ll walk your project with you, write up an upfront line-item quote, and stand behind the work for 730 days. We also service kitchens and baths with KraftMaid, Cambria, and Silestone finishes if your addition includes them. Call (888) 419-3650 for a free estimate – we answer live, any hour, any day.
Written by the team at Groundwork Construction Co. of Antioch, serving Antioch and nearby areas.