Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Home Additions & ADU: The Antioch Owner’s Guide
We install IKO-spec home additions and ADUs in Antioch, and a full addition runs $45,000 – $130,000 while a detached or attached ADU runs $90,000 – $220,000. The number that matters is the closing cost, not the opening bid, so we quote line by line and hold it. Most Antioch owners start here after a failed inspection sign-off or a contractor walk-off leaves a half-framed addition exposed to a Delta windstorm with no plan to finish it.
Which IKO Models This Applies To
IKO is best known on Antioch job sites for its roofing and waterproofing lines: the Cambridge and Dynasty shingle systems, Armourglass underlayments, and the StormShield line used around flat and low-slope transitions on additions. On an addition or ADU, those are the products that seal the tie-in between new construction and the original house, and they’re the ones most often specified wrong.
To identify what you’re working with, check the bundle wrapper or the stamp on the shingle tab (Cambridge has a distinct shadow line; Dynasty is the heavier laminated profile), and measure the exposure and the starter course. If your addition has a flat or low-slope section, the underlayment matters more than the shingle: StormShield and Armourglass have specific overlap and fastener requirements, and a crew that eyeballs them will fail inspection in Contra Costa County.
The OEM-versus-aftermarket call is simple on a roof tie-in: match the manufacturer’s rated system so the warranty isn’t voided by mixing components. On framing, windows and cladding, IKO doesn’t make the product, so you’re choosing among equally rated brands, and we specify Andersen, Pella, James Hardie and GAF where they fit better. Groundwork Construction Co. of Antioch is an independent builder; we aren’t affiliated with IKO.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Home Additions & ADU Is Failing
These are the symptoms we see walking Antioch additions and ADUs, and what’s usually behind them:
- Water staining on the ceiling where the addition meets the house. The step flashing or underlayment at the tie-in has lifted, and IKO systems fail here first because that’s the hardest detail to get right.
- Popped shingle tabs or granule loss within a few years. Usually a ventilation problem in the addition’s attic, not the shingle itself; trapped heat cooks the mat.
- Drafts or moisture at the new wall-to-old-wall seam. The air barrier and weather-resistive barrier were lapped in the wrong direction or taped with the wrong product.
- Damp drywall near the floor of a converted garage or ADU slab. Missing capillary break or grade that slopes back toward the new wall, a common issue on Antioch’s clay-heavy lots.
- Failed framing or rough-in inspection. The plans were drawn without the current California ADU code, and the crew built to the old set.
Replacement Cost & What’s Included
For Antioch, a full home addition lands at $45,000 – $130,000, an ADU at $90,000 – $220,000, and a garage conversion at $30,000 – $80,000. What moves the number: foundation type on expansive soil, roof complexity at the tie-in, whether you’re running new utilities, and finish level.
Here’s what drives the range, and what our quotes always include:
- Permits and inspections pulled and scheduled by us, not left to you.
- Foundation and framing engineered to the soil report, not a standard slab guess.
- Roof tie-in and weather barrier matched to the IKO system already on your house or specified new.
- Windows, siding and finish to the grade you choose.
Every addition we build is covered by our 730-Day Done Right Promise. If it’s not done right, we make it right. Pricing is upfront with no change-order surprises, and we offer 0% financing for 18 months plus $1,000 off projects over $10,000.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Here’s the honest split. You can safely check a leak by looking for staining and tracing it up to the roof line, and you can photograph the tie-in to show us. You can read your plans against the current ADU code and confirm your lot’s setback and coverage limits before anything is built. Those checks save time.
What you shouldn’t do yourself is roof work on an addition, shingle or underlayment installation at a tie-in, or anything involving framing and the structural connection to the original house. Fall risk, water intrusion and code compliance all stack up, and one bad detail can compromise the whole envelope.
If you’re mid-project with a failed inspection or a crew that walked, call us. We’ll look at the work as it stands and tell you what it takes to finish it right. Call (888) 419-3650 to schedule your free estimate. A live person answers, around the clock. Our technicians arrive background-checked and in uniform, and they have up to 12 years of experience.
FAQs
A well-built addition lasts decades, and the IKO roof tie-in typically goes 20 to 25 years before it needs attention. The real variable is the envelope detail at the tie-in, not the materials, and a proper install is what earns that lifespan. Call (888) 419-3650 for a free estimate on your project.
Often yes, especially if the issue is isolated to flashing, underlayment or a seam rather than the whole roof or structure. A repair makes sense when the damage is localized and the rest of the system is sound. We’ll tell you straight when a repair is enough and when it’s throwing money at a bigger problem. Call (888) 419-3650 and we’ll take a look.
A garage conversion runs a few months, a full addition longer, and an ADU longer still depending on permitting and site work. Timeline depends on permit turnaround, inspection scheduling and the size of the build. We set the schedule upfront and stick to it, because the number you see is the number you pay. Call (888) 419-3650 for a realistic timeline on your project.
We order through verified brand partners, so the IKO underlayment and shingles, Andersen and Pella windows, and James Hardie siding match the rated system and come with the right paperwork for inspection. We don’t carry stock and don’t claim to. We also work with KraftMaid, Cambria and Silestone on the interior finishes. Call (888) 419-3650 to talk through your build.
Let’s Get Your Antioch Addition Built Right
Whether you’re starting fresh on an ADU, converting the garage, or rescuing a half-finished addition from a contractor who disappeared, we’ll give you a straight answer and a written line-item quote. You’ll deal with upfront pricing, a live person on the phone 24/7, and a 730-Day Done Right Promise on the work. Call (888) 419-3650 for your free estimate.
Written by the team at Groundwork Construction Co. of Antioch, serving Antioch and nearby areas.