Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Junior ADU & Interior Conversion in Brentwood, CA: What It Takes and What It Costs
A junior ADU (JADU) is a small, code-defined living unit of up to 500 square feet created inside an existing single-family home, and an interior conversion is the same idea applied to a spare bedroom, den, or underused wing. In Brentwood, most of these projects run $45,000 – $130,000 and take 10 to 20 weeks from the first walkthrough to final inspection, depending on how much plumbing and electrical you move. Call (888) 419-3650 to schedule a free on-site estimate.

How the Work Actually Unfolds, Stage by Stage
We run these projects in a fixed sequence, and you’ll know what’s coming at each checkpoint. Here’s what a typical junior ADU & interior conversion in Brentwood looks like from start to finish.
- Stage 1 – Walkthrough and scope lock (week 1). We measure the existing room or wing, photograph the electrical panel and any plumbing chases, and confirm where the unit line will run under current California rules. You decide here: does the JADU need its own kitchenette, or just an efficiency sink and microwave? That one choice swings the budget by $8,000 – $20,000.
- Stage 2 – Design and permitting (weeks 2 – 6). We prepare plans and file with the City of Brentwood. JADUs have streamlined state approval rules, but your unit still needs to pass plan check for egress, smoke/CO alarms, and separation from the main living space. You’re choosing finishes during this window, not after, so the build doesn’t stall.
- Stage 3 – Demo and rough-in (weeks 6 – 9). Existing drywall and flooring come out, then framing for any new partition walls, then electrical and plumbing rough-in. If the unit gets a bathroom, this is where the drain work happens. The city inspects rough framing and rough MEP before we close anything up.
- Stage 4 – Insulation, drywall, and finishes (weeks 9 – 16). Spray foam or batt insulation, drywall, texture, paint, then flooring, cabinets, and fixtures. Tile work and cabinetry are usually the two longest stretches; they can run in parallel if the schedule allows.
- Stage 5 – Final inspection and punch (weeks 16 – 20). The city signs off, we do a walkthrough with you, and any punch items get handled before we close the file. The 730-Day Done Right Promise starts from that final walkthrough, and if something isn’t right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape a Junior ADU & Interior Conversion
A JADU has to feel like a real place to live in under 500 square feet. These are the decisions that separate a unit renters actually want from one that sits empty.
- Kitchenette vs. full kitchen. A two-burner cooktop, sink, and under-counter fridge keeps the unit efficient and cuts the cost. A full range and dishwasher use more of your square footage and require more electrical and plumbing work. If tenants in your area are cooking daily, the fuller setup pays for itself.
- Bathroom scope. A shower stall with a prefab pan runs less than a tiled walk-in. Tile gives a custom look and holds up well, but it adds labor days. Vanity sizes of 24 to 30 inches work best in a compact bath.
- Flooring. Luxury vinyl plank handles moisture and holds up under heavy use. Engineered hardwood looks warmer but costs more and doesn’t like wet rooms. Carpet in the sleeping area is the cheapeast option and the easiest to damage.
- Climate control. A ductless mini-split gives the unit its own thermostat and keeps it independent of the main house. Tying into the existing HVAC is cheaper up front but means shared heating and cooling, plus load calculations on the system. Brentwood summers hit 100°F often, so this choice matters.
- Windows and light. Reusing existing windows saves money. Adding a window or enlarging one brings in daylight that a small unit badly needs, and impact or dual-pane replacements improve both comfort and noise control.
What Junior ADU & Interior Conversion Costs in Brentwood, CA
The range for this work in Brentwood is $45,000 – $130,000, with most interior conversions landing in the $45,000 – $80,000 band and more involved builds with bathroom, kitchenette, and separate HVAC reaching the upper end.
| Component | Typical range |
|---|---|
| Design and permit filing | $3,000 – $8,000 |
| Electrical, plumbing, and mechanical rough-in | $8,000 – $22,000 |
| Drywall, insulation, and finish carpentry | $6,000 – $15,000 |
| Kitchenette and bathroom fixtures | $7,000 – $20,000 |
| Flooring, paint, and trim | $4,000 – $10,000 |
Five variables push a job toward the top of the range. First, whether you relocate plumbing (moving a toilet or drain adds $3,000 – $8,000). Second, whether the unit gets its own HVAC. Third, the existing condition of the space: an unfinished wing needs more than a finished spare bedroom. Fourth, finish grade, since a quartz countertop and tiled shower sit at a different price than laminate and a prefab pan. Fifth, whether any structural work is needed to open a load-bearing wall, which brings in a structural plan and engineering review.
A written estimate from us lists each of these line items, and the number on the page is the number you pay. A written line-item quote shows what’s included (demo, framing, rough-in, finish, inspection coordination) and what isn’t, like appliance purchases or landscaping around the exterior. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off. If the unit is part of a full Home Additions & ADU in Brentwood plan, we scope both together so the pricing stays consistent.
See the difference
Before
After
Before
After
Before
AfterWhat Brentwood Homes Specifically Do to This Job
Most of Brentwood’s housing stock dates from the 1990s through the 2020s, which means the interior conversion work is usually about opening up newer construction rather than restoring old bones. Mediterranean and Spanish-style stucco homes in the 94513 ZIP often have a spare bedroom or an underused den that’s already framed and drywalled, so we’re adding systems rather than building from scratch. The custom ranchettes on multi-acre lots offer more room to work, and we’ve converted detached wings and bonus rooms on properties off Marsh Creek Road and in the Deer Ridge area.

What catches people off guard in Brentwood is the ground. The expansive clay soils that make the area tricky for grading also affect anything that touches the slab or foundation, and summer highs over 100°F with persistent Delta winds accelerate stucco cracking and cause soil shrinkage. We check the condition of existing slab and stucco before we commit to a layout, because a JADU built over a settling slab will show it in the drywall within a season. Dust control during demolition matters here too, especially on larger lots where the unit is near living space. The City of Brentwood’s rules on JADUs are streamlined at the state level, but plan check still enforces egress, alarms, and separation from the main unit, so we account for that in the permitting timeline.
Serving Brentwood, CA – Our Local Coverage Area
We serve Brentwood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Junior ADU & Interior Conversion in Brentwood
Plan on 10 to 20 weeks from walkthrough to final inspection. Permitting takes 3 – 6 weeks, construction takes another 8 – 14 weeks, and bathrooms and kitchenettes add time to the finish schedule. Call (888) 419-3650 for a timeline based on your specific space.
Yes. A junior ADU requires a building permit and plan check in Brentwood, even though the state has streamlined the approval process. The unit needs to meet egress, smoke and CO alarm, and separation rules, and skipping the permit creates problems when you rent or sell. We handle the filing and coordinate inspections.
Often, yes. If the existing room sits near a bathroom or has access to a plumbing chase, we can tie into it and skip the drain relocation that adds cost. Layout and existing plumbing location are the two things that most affect whether this stays simple or gets expensive.
The range is $45,000 – $130,000, with most interior conversions in the $45,000 – $80,000 band. Kitchenette, bathroom, separate HVAC, and finish grade are the main drivers. Call (888) 419-3650 for an exact quote – estimates are free and we put the numbers in writing.
Every project is covered by our 730-Day Done Right Promise. If something we built fails or isn’t right, we make it right within that window. Our technicians have up to 12 years of experience, and they’re background-checked and arrive in uniform.
Get a Free On-Site Estimate for Your Brentwood JADU
Call (888) 419-3650 to schedule a free estimate for junior ADU & interior conversion in Brentwood and the surrounding area. We’ll walk the space, talk through layout and cost, and hand you a written line-item quote with no surprises. Live person answers the phone 24/7.
Written by the team at Groundwork Construction Co.