Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Livermore: What the Job Actually Involves
Cabinets & Countertops in Livermore typically runs $14,000 – $45,000 for a full replacement pairing new cabinetry with stone or quartz tops, and a straightforward kitchen with stock-to-semi-custom boxes lands closer to the middle of that range. Most projects take three to five weeks from demo to final caulk line, though the countertop template-to-install window adds a hard week of waiting no contractor can compress. Call (888) 419-3650 for a free on-site estimate with line-item pricing before anything gets ordered.

How We Run a Cabinet and Counter Replacement, Stage by Stage
Every jobsite is different, but the sequence for a cabinet and countertop swap is predictable, and knowing it means you can plan your life around it.
Day 1: Demolition and site protection
We pull the old doors and boxes, shut off and cap the water and gas lines to the sink and range, and lay floor protection across the walking path. Disposal of old cabinets usually happens the same day. You’ll need an empty kitchen and a plan for eating out for the first week.
Days 1 – 2: Wall and rough-in checks
Once the boxes are out, we check what was hiding behind them: out-of-plumb walls, water damage under the sink, or a range hood that vented nowhere. This is where older Livermore homes often surprise us. Any electrical or plumbing relocation gets handled now, before new cabinets arrive, because moving a circuit later means cutting into fresh drywall.
Days 2 – 3: Cabinet installation
Upper and lower boxes go in, leveled and shimmed to the wall and secured to studs. The countertop overhang and the sink cutout get laid out before anything is shimmed into place permanently. This is usually the fastest stretch of the job for a standard layout.
Days 4 – 10: Template, fabrication, install
A quartz or stone counter can’t be ordered from a catalog: a fabricator has to template the installed cabinets in person, then cut the slab. Expect seven to ten business days from template to install, sometimes more for edge profiles or a sink cutout with a specific radius. That gap is the main reason a “fast” kitchen job still takes weeks.
Days 10 – 21: Finish work
Countertops go on, the sink and faucet get set, and appliances slide back. We finish panel ends, end caps, and crown, then handle any backsplash work last since it needs the counter in place. Final walkthrough comes after, and everything is documented in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
The material conversations happen at the estimate, and each one trades cost against durability and look.
- Cabinet grade: stock boxes are cheapest and fastest but limited in size; semi-custom gives you more sizing and finish choices at a middle price; full custom means exact dimensions and specialty storage at the top of the range. KraftMaid is a strong semi-custom anchor for typical Livermore kitchens.
- Cabinet construction: plywood boxes outlast particleboard in a wet sink base, and dovetail drawers with soft-close slides hold up far longer than stapled particle drawers.
- Countertop material: laminate is the budget choice and shows wear fastest; quartz is the working-horse pick for families (Cambria is a common one), resistant to staining but sensitive to direct heat; natural stone like granite or marble is unique and cool to the touch but needs sealing and can chip; butcher block is warm and forgiving but requires oil maintenance.
- Edge profile and thickness: a standard eased edge on 2cm material costs less than a stacked 3cm edge or an ogee profile, and edge detail often accounts for a few hundred dollars of the countertop line.
- Hardware and finish: cabinet pulls run a small budget line but a huge visual one; soft-close hinges are standard on most modern cabinets and worth insisting on if a quote leaves them out.
What Cabinets & Countertops Cost in Livermore, CA
For a full cabinet and countertop replacement in Livermore, plan for $14,000 – $45,000 depending on the size of the kitchen, cabinet grade, and counter material. Here’s how the line items break down:

- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Kitchen island installation, if you’re adding one: $3,000 – $10,000
What pushes a job to the high end? Square footage first, since more boxes and linear feet of counter means more material and more labor. Existing conditions come second: a wall that needs reframing or a sink that needs relocating adds real cost. Material grade is the biggest swing, since a quartz-topped kitchen can double the countertop line over laminate. Layout changes and permit scope round it out. Anything outside a written estimate gets flagged before we touch it, so the number you see is the number you pay. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat Livermore Homes Specifically Do to This Job
Livermore’s older housing stock around downtown, in the 94550 ZIP, is where this work gets interesting. Many of those single-story homes date to the early 1900s through the 1950s, built with raised foundations and, in places, knob-and-tube wiring. That matters when cabinets come out: a wall that needs a new circuit or a relocated outlet for an under-cabinet light means the electrical work has to meet current code, and the seismic bracing requirements here are strict because Livermore sits on the Greenville Fault in the seismically active valley. Cabinets anchored to a wall in an older home need to be secured with that bracing in mind, especially if you’re adding a heavy stone counter. In 94551, east-side tract homes from the 1970s through the 1990s typically have more standard layouts and fewer surprises, but slab movement and the clay soil beneath mean checking level is never skipped. If the cabinet replacement is part of a Kitchen Remodeling in Livermore, we coordinate the cabinet crew and the countertop fabricator so the sequence doesn’t stall.
Serving Livermore, CA – Our Local Coverage Area
We serve Livermore and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Livermore
Three to five weeks for a full replacement, with the countertop template-to-install window taking up a full week of it. The biggest variable is whether the cabinets are stock or custom, since custom arrives with longer lead times. Call (888) 419-3650 and we’ll give you a real timeline once we see the kitchen.
Straight like-for-like replacement usually doesn’t require a permit, but moving a wall, relocating plumbing, or adding a gas appliance does. Any structural or electrical change in an older downtown home may also trigger a seismic review from the building department. We’ll flag exactly what triggers a permit before work begins, and we pull it when it’s needed.
Yes, and it’s the most common way we do it. A like-for-like replacement keeps the existing sink and appliance locations, which cuts cost and avoids permit scope. Moving a sink to an island or adding a gas range hood is where the job gets bigger and pricier.
$14,000 – $45,000 for a full kitchen, or roughly $4,000 – $13,000 for cabinet installation alone and $2,000 – $6,500 for countertops. Material grade and kitchen size move the number most. Call (888) 419-3650 for an exact quote – estimates are free.
Every job is covered by the 730-Day Done Right Promise – if it isn’t done right, we make it right. That’s one of the longer workmanship guarantees in residential construction. Ask about it at the estimate and we’ll put it in writing.
Get a Free Cabinet and Countertop Estimate in Livermore
Call (888) 419-3650 for a free on-site estimate and design consult. On the call we’ll ask about your kitchen size, what needs to change, and your material leaning, then set a time for a walkthrough. You’ll leave with a line-item quote and a written promise on workmanship. If you’re pairing this with a bathroom update, many homeowners also add a Walk-In Showers & Shower Remodeling in Livermore or a Tub-to-Shower Conversion in Livermore while we’re on site, and you can see our broader Kitchen Remodeling scope or explore all we do in Livermore.
Written by the team at Groundwork Construction Co.