New Detached ADU in Brentwood, CA: What It Takes and What It Costs
A new detached ADU in Brentwood usually runs $90,000 – $220,000 depending on size and finish level, with most of our detached builds landing in the $150,000 – $190,000 band for a 600 – 800 square foot one-bedroom unit. Plan on 6 to 9 months from the first site visit to move-in day, and budget 10 to 14 weeks of that for design, engineering, and Contra Costa County plan check before a shovel touches the ground. Call (888) 419-3650 to set up a free on-site estimate and we’ll walk your lot, check setbacks, and give you a written number.

How a Detached ADU Gets Built in Brentwood, Stage by Stage
Detached work is a different animal from a conversion. There’s no existing structure to lean on, which means every utility, every footing, and every inspection starts from zero. Here’s the sequence we run.
Stage 1: Site visit and feasibility (week 1)
We walk the lot and check what Brentwood’s zoning actually allows on your parcel: setbacks from the rear and side property lines, maximum height, lot coverage, and whether your lot size supports the square footage you’re picturing. You decide the unit size and whether it’s a rental, a family unit, or a home office with a bathroom. That decision drives everything downstream, so it happens here, not later.
Stage 2: Design, engineering, and plan check (weeks 2 – 14)
We produce the site plan, floor plan, elevation, and structural package, then submit for permits. Soils and grading come into play on former orchard parcels, which is common across Brentwood. You’ll be choosing exterior finish, roof style, and window package during this window because those decisions get baked into the drawings. Approvals move at the county’s pace, not ours, and we tell you upfront what the realistic turnaround looks like rather than promising a date we can’t control.
Stage 3: Site prep and foundation (weeks 15 – 19)
Day one on site is grading and utility trenching. This is where Brentwood lots surprise people. Excavation on old orchard ground turns up furrow lines, buried irrigation pipe, and sometimes residual pesticide, and that means soil testing before we pour anything. Expansive clay under the topsoil has to be handled correctly or your slab moves. By the end of this stage you have a poured, inspected foundation and stubbed utilities.
Stage 4: Framing, rough-in, and inspections (weeks 20 – 30)
Framing goes up, then roofing, then the rough plumbing, electrical, and mechanical trades follow, each one stopping for its own inspection. You’ll pick fixtures and finishes now if you haven’t: tile, cabinets, countertops, lighting, flooring. Skipping those decisions here is the single biggest cause of a stalled schedule, so we lock them before framing closes.
Stage 5: Finish-out and final walkthrough (weeks 31 – 38)
Drywall, paint, cabinets, flooring, trim, and hookups. Once the final inspection clears, we walk the unit with you room by room, build a punch list together, and close it out. This is the part where the workmanship either holds up or doesn’t, which is why every project carries our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for a Detached Unit
A detached ADU isn’t a single product. It’s a stack of decisions, and each one moves cost and longevity.
- Slab-on-grade vs. raised floor: Slab is cheaper and works well on graded Brentwood lots; a raised floor costs more but can handle drainage and grading issues better on uneven ground.
- Stick-built vs. modular: Stick-built gives you total control over layout, roofline, and finish to match the main house; modular units arrive faster but constrain the footprint and customization.
- Stucco vs. siding: Stucco matches most Brentwood home exteriors and suits the local Spanish and Mediterranean styles; lap siding costs less in some cases but reads differently against the main structure.
- Roof: composition shingle vs. tile: Shingle holds up fine under the heat and costs less; tile matches a custom main roof and lasts longer, at roughly double the material cost.
- Fixtures and finishes: A basic kitchen with off-the-shelf cabinets versus a full finish with quartz counters and Schluter waterproofing in the shower. Grohe fixtures and a Toto toilet are common upgrades on units meant to rent at a premium.
- Systems: A mini-split heat pump is the standard for a single-zone unit and is efficient in Brentwood’s climate; a full ducted system only pays off on larger layouts.
What a New Detached ADU Costs in Brentwood, CA
Detached ADU construction in Brentwood prices at $90,000 – $220,000, with our detached builds typically landing in the $150,000 – $190,000 range. The number you see in your written estimate is the number you pay. Five variables pull a job toward the low or high end:

- Size and layout: a 500-square-foot studio and a 1,000-square-foot two-bedroom sit at opposite ends of that range.
- Site condition: sloping lots, drainage work, and expansive clay handling add cost that flat, well-drained lots don’t carry.
- Utility run distance: the farther the unit sits from your main electrical panel and sewer connection, the more trenching and line work.
- Finish grade: standard builder finishes versus premium counters, custom cabinetry, and upgraded fixtures.
- Roof and exterior complexity: a simple gable roof with matching stucco is the lower-cost road; matching a custom roofline with tile adds material and labor.
Your written estimate should spell out foundation, framing, roofing, all three utility rough-ins, insulation, drywall, finish materials, and permit fees. Site work surprises like unmarked irrigation lines or excess soil haul-off are the usual exclusions, and we flag those before breaking ground, not after.
See the difference
Before
After
Before
After
Before
AfterWhat Brentwood Lots Specifically Do to a Detached ADU Build
Brentwood grew from orchard land into one of eastern Contra Costa County’s fastest-expanding suburbs, and that history sits directly under your new foundation. Excavating former farmland in the 94513 ZIP regularly turns up old furrow lines, buried irrigation pipe, and residual pesticide, which means soil testing and proper disposal before a foundation pour. Add expansive clay that shrinks and swells with the seasons, summers that regularly top 100°F, and persistent Delta winds, and you get a build that demands correct grading, drainage, and stucco detailing. Custom ranchettes on multi-acre lots out toward the eastern edges give you room for setbacks, while the newer tract homes in the central neighborhoods often have tighter lot lines to work against. If this is part of a full Home Additions & ADU in Brentwood plan, we coordinate the two so the ADU and any main-house work share one site plan and one schedule. Our Home Additions & ADU service handles the wider scope, and we cover the whole Brentwood area, from Discovery Bay and Oakley to Clayton and Antioch.
Serving Brentwood, CA – Our Local Coverage Area
We serve Brentwood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Brentwood
Expect 6 to 9 months total, with 10 to 14 weeks of that in design and plan check before construction starts. The build itself runs 5 to 6 months on a straightforward unit. Call (888) 419-3650 for a schedule estimate based on your lot.
Yes. A new detached ADU requires a building permit plus separate sign-offs for grading, electrical, plumbing, and mechanical work. We pull the permits and carry them through every inspection. Call us to confirm what your specific parcel will need.
Yes. A detached unit gets its own utility runs from your existing panel and sewer lateral, so your main house stays untouched. The variable is distance: longer runs mean more trenching and cost, not disruption inside your home.
Detached ADU construction in Brentwood runs $90,000 – $220,000, and most of our builds land between $150,000 and $190,000. Size, site condition, utility distance, and finish grade drive the range. Call (888) 419-3650 for an exact written quote – the estimate is free.
Every ADU we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t right within that window, we make it right. We also offer 0% financing for 18 months and $1,000 off projects over $10,000.
Get Your Free New Detached ADU Estimate in Brentwood
Call (888) 419-3650 and a live person answers, any hour. We’ll schedule a free on-site visit, walk your lot, check setbacks and grading, and hand you a written, line-item estimate with no change-order surprises. While we’re at it, homeowners often pair an ADU build with Backsplash, Tile & Flooring in Brentwood for the unit’s interior or Kitchen Design & Layout in Brentwood for the main house. One call starts all of it.