Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Antioch: What It Costs and How Long It Takes
A tub-to-shower conversion in Antioch typically runs $9,000 – $28,000 for a full build with new waterproofing, tile, drain and fixtures, and a straight swap over the existing tub footprint lands nearer $3,500 – $10,000. Most conversions take 5 to 10 working days once materials are on site, plus a rough-in inspection. Call (888) 419-3650 for a free on-site estimate and a written line-item quote.

How We Run a Tub-to-Shower Conversion, Stage by Stage
We don’t hand you a schedule and disappear. Every conversion follows the same five stages, and you’ll know which decisions are yours at each one.
Stage 1: Measure, estimate and permit (days 1 – 5)
We measure the alcove, check joist direction and the existing drain location, and photograph the valve and supply lines behind the tub wall. You pick the footprint, the pan option and the wall finish. We pull the permit and give you a written line-item quote before any demolition starts.
Stage 2: Demo and rough-in (days 1 – 2 on site)
Out comes the tub, the old surround and any rotted backer. We inspect the valve, replace it if it’s at end of life, and reposition the drain if your footprint is changing. Plumbing and electrical rough-in get inspected here, which is the one stage that adds wait time.
Stage 3: Waterproofing (day 3)
This is where cheap conversions fail. We install a bonded waterproofing sheet system such as Schluter KERDI over cement backer, seal every seam and corner, and flood-test the pan before a single tile goes down.
Stage 4: Tile, pan and fixtures (days 4 – 8)
Wall tile, shower floor, niche and trim go in, followed by the drain grate, valve trim, head and glass. You confirm grout color and fixture finish early in this stage so nothing stalls.
Stage 5: Final inspection and walkthrough (days 9 – 10)
We pass the municipal inspection, clean the site and walk you through the finished shower and the low-maintenance care routine. Your work sits under our 730-Day Done Right Promise – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for Your New Shower
The footprint decision drives everything else, so make it first. Here’s what actually changes the price and the long-term result.
- Acrylic or fiberglass pan vs. tiled shower with a custom pan: A prefab acrylic pan (Sterling and similar lines) is the fastest, cheapest option and holds up well in a busy kids’ bathroom. A tiled pan built on a waterproofing membrane costs more and looks like real tile, but it needs a contractor who builds the slope correctly. We recommend it when you’re already tiling the walls.
- Prefab wall panels vs. porcelain or ceramic tile: Panels keep costs down and clean up in seconds. Tile is a longer install, tolerates upgrades like a bench or niche, and is where most Antioch homeowners put the budget.
- Schluter KERDI vs. a traditional mortar-and-liner pan: A bonded waterproofing sheet system (Schluter) is our standard for tile showers because it fails predictably when installed right. Traditional liners work but depend heavily on craft.
- Valve and showerhead brand: Grohe and Toto trim run mid-to-upper in cost and carry serviceable parts. Budget builder-grade trim saves a few hundred dollars up front and is harder to find parts for later.
- Glass vs. curtain: A framed glass door runs higher than a curtain and rod but finishes the job and keeps splash off the floor. One fixed panel plus a half-wall is a middle route if you want an open feel without full-glass cost.
- Bench, niche and grab-bar blocking: Adding a bench, recessed niche or blocking for a future grab bar means framing changes during rough-in. Decide before demolition, not after tile.
What Tub-to-Shower Conversion Costs in Antioch, CA
A tub-to-shower conversion in Antioch runs $3,500 – $10,000 when the new shower sits over the existing tub footprint, and $9,000 – $28,000 when you’re rebuilding with new waterproofing, tile, drain and fixtures. The number you see is the number you pay, locked into your written estimate.

| Line item | Typical range |
|---|---|
| Straight swap, prefab pan and panels | $3,500 – $6,000 |
| Tiled shower with custom pan | $6,500 – $12,000 |
| Drain relocation or valve replacement | $500 – $1,800 |
| Glass door or fixed panel | $700 – $2,000 |
Five things push a job toward the high end. Alcove size and shape matter if you’re widening the opening or knocking out a half-wall. Existing condition matters if you find rot, a failing valve or old backer that won’t hold. Moving plumbing or electrical adds rough-in and inspection time. Material grade – prefab vs. full tile, builder trim vs. Grohe – swings thousands. Permit scope changes if you’re relocating a drain or reconfiguring framing, since that involves inspection and sometimes engineering.
Your written estimate includes demolition, waterproofing, tile and setting materials, drain, valve trim, glass, labor, the permit and cleanup. It usually excludes a new valve body if the old one fails inspection mid-job and any structural repair we only find after opening the wall. We document surprises with photos before we charge for them.
See the difference
Before
After
Before
After
Before
AfterWhat Antioch Homes Specifically Do to a Tub-to-Shower Conversion
Antioch’s flats – the 1950s-1970s ranch tract homes and older downtown stock – are where most of our conversions happen, and they bring their own problems. Original bathroom walls often hide galvanized steel supply lines and cast-iron drain stub-outs, so we plan for valve and drain replacement before demo, not after. The expansive clay soils that define much of Antioch’s ground mean slabs settle unevenly, and we’ve pulled out tub alcoves that were out of plumb by over an inch corner to corner, which takes extra framing before the pan can sit level. Older homes in the river-adjacent blocks also show the moisture and drainage issues that come with a high water table; that means checking for past water intrusion behind the tub wall before we close it up. Because Antioch’s heat is dry and intense, our tile setting schedule accounts for fast-drying mud and grout, and we stage materials out of direct sun. Showers here are a smart renovation for our hill subdivisions too, where aging builder-grade tub surrounds are finally failing. It’s often the first step toward a broader upgrade, and many of our Antioch homeowners fold it into a full Bathroom Remodeling in Antioch project without doing the whole room at once.
Serving Antioch, CA – Our Local Coverage Area
We serve Antioch and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions: Tub-to-Shower Conversion in Antioch
A tub-to-shower conversion usually takes 5 to 10 working days once permits are issued, with demolition and rough-in front-loaded and tile work finishing the schedule. The permit review and inspection add a wait, so plan on two to three weeks from contract to walkthrough. Call (888) 419-3650 to schedule your free estimate.
Yes in most cases, any conversion that touches plumbing, the shower drain or the toilet location on the same wet wall needs a permit and inspection. A pure cosmetic swap over the existing tub footprint sometimes avoids one, which we confirm during your estimate. Your written quote states exactly which permits are included.
Often yes – if the new shower footprint covers the old tub footprint, the drain can usually stay, which keeps costs near $3,500 – $6,000. Widening the shower or shifting the drain adds rough-in work and an inspection. We measure the actual drain location before we quote.
Tub-to-shower conversion in Antioch runs $3,500 – $10,000 over the existing footprint and $9,000 – $28,000 for a full rebuild with tile, waterproofing and new fixtures. Material grade, drain relocation and hidden damage are the big drivers. Call (888) 419-3650 for an exact quote – estimates are free.
Every conversion we complete is covered by our 730-Day Done Right Promise, and if the workmanship isn’t right we make it right. Fixture and tile manufacturer warranties run separately on top. We spell out exactly what’s covered, in writing, before work starts.
Get Your Free Tub-to-Shower Conversion Estimate in Antioch
We’ll come out, measure the alcove, look behind the tub wall for the valve and drain surprises that older Antioch homes hide, and hand you a written line-item estimate – free, no pressure, no vague “starting at” pricing. You’ll know the footprint options, the permit scope and the real total before you decide. Call (888) 419-3650 today, or ask us about $1,000 off projects over $10,000 and 0% financing for 18 months. A live person answers, 24/7.
Written by the team at Groundwork Construction Co.