Garage Conversion ADU in Brentwood, CA: What It Costs and What It Takes
A garage conversion ADU in Brentwood, CA typically runs $45,000 – $130,000, with most single-bay conversions landing in the $45,000 – $80,000 range and larger double-garage builds pushing toward the top. The work itself takes 3 – 5 months from permit submittal to final inspection. The number that matters most on your street is whether that garage is a front-facing attached bay in a 2000s production tract or a detached shop on a custom lot out toward the orchard edges. Call (888) 419-3650 and we’ll walk your specific garage, not a generic template.

How We Turn a Brentwood Garage Into a Livable ADU, Step by Step
Garage conversion is the most predictable ADU route in Brentwood because the shell already exists. What changes is everything inside it. Here’s the sequence we run, and where you make decisions.
Stage 1: Feasibility and permitting (weeks 1 – 6)
We start by measuring clearances, checking the foundation slab, and confirming ceiling height against California ADU standards. You’ll decide whether this is a rental unit, a family suite, or a home office with a bath, because that decision drives the entire floor plan. Permit submittal to the City of Brentwood usually clears in 4 – 8 weeks, sometimes longer if the site plan needs drainage or grading review.
Stage 2: Demo and structural (weeks 6 – 9)
The garage door comes out and gets framed, insulated, and finished as a wall. We cut in a new exterior door, add a window where the plan calls for one, and address any slab cracks or settling. In Brentwood’s expansive clay, we find movement more often than you’d expect in a 15-year-old slab. You’ll decide on the window and door style here, which we order early.
Stage 3: Rough-in trades (weeks 9 – 13)
Plumbing, electrical, and HVAC go in before any drywall. This is where your decisions really shape the cost: a full kitchenette and a stacked washer-dryer set means new supply and drain lines; a simple kitchenette with a mini-fridge and microwave pulls far less. Electrical goes from a panel load calculation through new circuits and, if needed, a subpanel.
Stage 4: Insulation, drywall, and finishes (weeks 13 – 18)
Insulation spec matters more here than in an old Bay Area bungalow. Brentwood summers top 100°F, so we build to Title 24 requirements with a properly sized heat pump or mini-split. You’ll pick flooring, paint, cabinets, and fixtures during this stretch. Most homeowners pair this with a light pass at the kitchen or bath finishes, and it’s common to coordinate those selections with Cabinets & Countertops in Brentwood to keep the schedule tight.
Stage 5: Final trades and inspection (weeks 18 – 22)
Tile, trim, paint, and fixture setting wrap up, then the final inspection and certificate of occupancy. We don’t hand over keys until that sign-off is in hand. From there the space is yours, whether that means a tenant moving in or a parent settling in down the hall.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Garage Conversion ADU
Every conversion sits on a handful of fork-in-the-road decisions. Here’s what you’re actually choosing between, and the honest trade-off on each.
- Wall system at the old garage door: A framed stud wall with stucco to match the house is the standard path and blends in. A window-wall with a large fixed pane brings in real light and looks intentional from the street. The window option adds cost but reads better from the curb and helps resale.
- HVAC: A ducted mini-split costs more up front but distributes air evenly across the room. A single-zone wall unit is cheaper and simpler, but the far corner will run warmer on a July afternoon in Brentwood.
- Flooring: Luxury vinyl plank handles moisture and slab movement and is the safe default. Tile in the bath and entry is worth the extra spend. Carpet is warm but wears fast in a rental.
- Kitchenette scope: Sink-and-counter only, a full cooktop and vented hood, or nothing at all if this is a bedroom suite. Each step up changes the plumbing and electrical rough-in.
- Bathroom configuration: A curbless walk-in shower costs more to build but ages well and suits a family suite. A tub-shower combo fits a tighter footprint and costs less.
For the exterior, if the garage door face gets replaced with a paver apron or a hardscape walkway, we often bring in Belgard or Techo-Bloc pavers to match the drive. Those same pavers work well if you’re also freshening up the floor inside your main house with Backsplash, Tile & Flooring in Brentwood.
What a Garage Conversion ADU Costs in Brentwood, CA
Budget $45,000 – $130,000 for the full job. Where you land inside that range comes down to five variables:

- Garage size: A single-bay conversion at 240 – 300 sq ft sits at the low end. A double-garage at 400 – 500 sq ft pushes toward the high end.
- Plumbing relocation: If the new bathroom is directly behind the garage wall, drainage is a short run. If it’s across the slab, trenching and re-pouring drives the number up.
- Electrical and panel capacity: An older 100-amp panel may need an upgrade; a newer 200-amp panel usually handles a subpanel without a service change.
- Finish grade: Builder-grade LVP, a stock vanity, and a simple kitchenette versus tile, custom cabinetry, and a walk-in shower can easily swing the number by $20,000.
- Permit scope: A straight garage conversion usually carries one set of permits. If site grading, drainage, or a new driveway apron is required, that adds a separate line item.
Our written estimate is line-item and fixed. You’ll see the demo, framing, electrical, plumbing, HVAC, insulation, drywall, finishes, and inspection fees broken out, so you know exactly what you’re paying for. It’s true that a few items usually fall outside a standard conversion contract, and we flag those clearly: landscape repair around the old apron, HOA application fees, and utility connection charges if a new meter is needed.
See the difference
Before
After
Before
After
Before
AfterHow Brentwood’s Housing and Climate Change This Job
Brentwood’s housing stock is overwhelmingly new, which is actually good news for a garage conversion. The 1990s-to-2020s stucco homes in the established tracts were built to modern framing standards and typically have a 200-amp service, so we’re rarely upgrading a panel. Where the housing stock introduces friction is in the expansive clay under those slabs. Brentwood’s dry inland summers pull moisture out of the soil, and a garage slab poured 20 years ago can show cracks and settling that reads as cosmetic until we cut the floor for plumbing. We probe the slab before we quote, not after. On custom ranchettes toward the orchard edges, we regularly see detached shops with old furrow lines and buried irrigation pipes still in the soil, and those need to be located and capped before we trench.
HOA rules matter here too. Many of the newer tracts in Brentwood have architectural review boards that will look at the new garage face and the exterior finish, and the City of Brentwood’s ADU ordinance has specific rules about height, setback from the rear property line, and parking replacement when you remove a garage bay. Brentwood’s summer heat also means your heat pump or mini-split needs to be correctly sized and installed with proper refrigerant line routing, and we don’t shortcut that. The dust control and irrigation plan during grading is another local reality that doesn’t apply in older Bay Area cities, and it’s part of why a Brentwood garage conversion needs a contractor who’s worked this specific terrain.
Serving Brentwood, CA – Our Local Coverage Area
We serve Brentwood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Brentwood
Expect 3 – 5 months from permit submittal to final inspection. The City of Brentwood’s permit review alone runs 4 – 8 weeks, then construction moves through 14 – 18 weeks of build. Call (888) 419-3650 for a more accurate timeline based on your garage.
Yes. Every Garage Conversion ADU in Brentwood requires a building permit, and you’ll want it for insurance and resale reasons alone. We pull the permits, manage the inspections, and don’t hand over the space until the certificate of occupancy is signed off. Estimates are free at (888) 419-3650.
Sometimes. If the new bath backs up to an existing wet wall and the slab is sound, the plumbing run is short and the cost stays on the low side of $45,000. If the bath has to go across the slab or the roofline needs a bump-out, expect the high end. Call us and we’ll tell you straight which side your garage falls on.
A fixed, line-item price covering demo, framing, electrical, plumbing, HVAC, insulation, drywall, flooring, paint, and the permit and inspection fees. The written estimate you get from Groundwork breaks every line out, so the number you see is the number you pay. Call (888) 419-3650 for your free on-site estimate.
Every project we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t done right in that window, we make it right. Call (888) 419-3650 to start your estimate.
Start Your Garage Conversion ADU Estimate in Brentwood
Your garage is already a shell. The question is what it becomes. Call (888) 419-3650 and a live person picks up any hour, any day, to schedule your free on-site estimate. We walk the space, discuss the plan, and send a fixed, line-item quote for your Garage Conversion ADU in Brentwood. Estimates are free, and if the job grows into a broader scope, it’s all under the same roof as Home Additions & ADU in Brentwood, plus our Home Additions & ADU service covers the whole range. From foundation to finish line, we’re reachable across Brentwood and the surrounding Delta area.